Steam Room Installation
Fully tanked, tiled or acrylic steam rooms at 100% humidity — vapour barrier, fall-to-drain and generator sizing done properly.
Read more
A steam shower is the least disruptive way to get real steam into a home. The drain, the water feed and the enclosure already exist, so the work is sealing the space properly and finding a home for the generator.
43–45°C / 100% RH
We convert existing showers into sealed steam enclosures across Dubai, and build new steam showers as part of bathroom projects. It is the fastest route to steam in a home: no new drainage, no structural work, and usually no municipality submission. Part of our full sauna and steam room installation service in Dubai.
Steam escapes through any gap, and an enclosure that leaks steam will never hold temperature. The shower needs full-height glass, a hinged door with seals on three sides, and a deliberate gap at the threshold for make-up air. Sliding screens and open walk-in entries do not work without modification.
A shower built to normal standards is waterproofed for splashing water, not for continuous 100 per cent humidity across every surface including the ceiling. Where the existing tiling is sound and fully tanked we can work with it. Where it is not, the tiles come off, the membrane goes on and the room is flood-tested before re-tiling. We will tell you which case you are in at the survey rather than after starting.
A dropped ceiling panel laid to a minimum two-degree fall, tiled or in solid surface, sending condensate to the wall rather than onto your head. This is the detail that separates a steam shower people use from one they stop using.
Sized to the enclosure volume, positioned dry and accessible, piped in insulated line with the steam outlet placed low and away from the seat, behind a scald guard. Controls go outside the wet zone or use a sealed in-shower panel.
| Element | What we specify |
|---|---|
| Operating climate | 43-45°C, 100% relative humidity |
| Enclosure | 10 mm toughened glass, full height, sealed door |
| Ceiling | Dropped panel, minimum 2° fall, max 2.4 m height |
| Generator | Tylö, Harvia or Steamtec, 4.5-9 kW typical |
| Generator position | Dry, ventilated, accessible, within ~15 m |
| Steam outlet | Low level, away from seating, scald guard fitted |
| Seating | Folding teak or tiled bench, drained |
| Waterproofing | Liquid membrane, full height and ceiling, flood-tested |
| Lighting | IP65 minimum, low voltage |
| Heat-up time | 8-12 minutes |
| Scope | Indicative installed price | Programme |
|---|---|---|
| Conversion, existing tiling sound | AED 12,000 - 28,000 | 1-2 weeks |
| Conversion including re-tanking and re-tiling | AED 24,000 - 42,000 | 3 weeks |
| New steam shower within a bathroom build | AED 20,000 - 38,000 | 2-3 weeks |
| Generator only, supply and fit | AED 6,500 - 15,000 | Within a week |
Steam showers across Dubai including Downtown, Business Bay, Dubai Marina, Jumeirah, Palm Jumeirah and Dubai Hills, plus Abu Dhabi, Sharjah, Ajman and Ras Al Khaimah.
Most can, if three things are true: the enclosure can be sealed to full height with a proper door rather than a screen, the ceiling is no higher than about 2.4 metres, and there is a dry, accessible position for the generator within roughly 15 metres. Walk-in showers with an open entry are the usual problem, because steam simply leaves. That can be solved with a glass return panel and a door.
In a dry, ventilated space with access for servicing: a vanity cupboard, a linen store, a ceiling void with a hatch, or a nearby utility room. It must never be sealed permanently behind plasterboard, because it needs descaling two to four times a year in Dubai. We plan the position at survey and pipe the run insulated.
Between AED 12,000 and 28,000 for a conversion using the existing enclosure and drainage. A new build enclosure with fresh glass, tiling and a bench is typically AED 20,000 to 38,000. The generator is usually a third to a half of the total.
Yes, for the same reason it does in a full steam room. A flat ceiling drips on the person underneath. A fall of at least two degrees, running away from where you stand or sit, sends condensation down the wall instead. In a shower conversion this is normally achieved with a dropped, sloped ceiling panel.
Yes. A steam shower is a shower with a steam function added, so the mixer, the head and the drain all work exactly as before. Most owners use the steam a few times a week and the shower every day.
One to two weeks for a straightforward conversion, most of which is the sealing, the ceiling and the glass. If the enclosure has to be re-tiled and re-tanked, allow three weeks because the waterproofing needs to cure and be tested before tiling.
Fully tanked, tiled or acrylic steam rooms at 100% humidity — vapour barrier, fall-to-drain and generator sizing done properly.
Read moreSupply, sizing, descaling and same-week repair for Tylö, Harvia, Steamtec and Mr.Steam generators.
Read moreTadelakt walls, heated treatment beds and steam supply for salons and villa wellness suites.
Read moreHeated marble göbektaşı slabs, domed ceilings and radiant benches built by tilers who have done it before.
Read moreBespoke cabins fitted into villa bathrooms, basements and terraces across Palm Jumeirah, Emirates Hills and Dubai Hills.
Read moreQuarterly descaling, element checks and timber care — annual contracts that keep a room out of downtime.
Read moreThirty minutes on site tells us more than an hour on the phone — and it is the only way to give you a price that does not move.